Energetika Třinec – replacement of old turbo-compressor

2019

The project scope covered design, removal of existing, install new and commission new electrical Turbo-Compressor with significant energy reductions increased efficiency leading to “Life Cycle” operational benefits. The project was run under a ‘Turn-Key’ basis.