Extension of liquid cargo terminal in Koper, Slovenia | 2017
Engineering, production, delivery and start-up of technology for measuring of light products including JET-A1 loaded to tanktrucks and railcars. Metering lines in a form of skids, independent density measurement, additive dosing and colouring system, loading arms. System for automation and administration of the terminal - TAMAS.
INA, Modernisation of tanktruck terminal, Rijeka refinery | 2016
Engineering, production, delivery and start-up of technology for measuring of light and heavy products loaded to tanktrucks. Metering lines in a form of skids, independent density measurement, extension of additive dosing system, tanktrucks weight scales, loading arms. System for automation and administration of the terminal - TAMAS.
BUILDING OF JET FUEL STORAGE IN LIELVARDE AIRFIELD IN LATVIA | 2015

BUILDING OF JET FUEL STORAGE IN LIELVARDE AIRFIELD IN LATVIA / 2014 - 2015

The contract for NSPA: Construction of new terminal JET-A1 with 2 vertical storage tanks, one place for unloading tank trucks, two loading SKIDS (islands) for loading tank truck, including additivation system, control system and instrumentation and TAMAS system.

Additive dosing at Petrochina Shilou terminal | 2014
Additive dosing at Shilou terminal
Delivery and start-up of additive dosing for tanktruck loading terminal for 9 loading lines. Complete additive dosing technology system - unloading, storage, delivery, system integration
Delivery and start-up of additive dosing system for tanktruck loading terminal for 9 loading lines. Complete additive dosing technology system: unloading, storage, delivery, system integration.
Detail design for Dongguan terminal | 2014

Detail Design Documentation Package for newly built Petrochina terminal in Dongguan. Includes technology for tanktruck loading and control system for the entire tankfarm with planned capacity 400.000 m3. Dongguan is first Chinese terminal designed according to European conventions.

Vendys&V, Custody transfer measurement and additive dosingin the new part of terminal Ceska Lipa | 2014
Design, delivery and start-up of technology and control system for tanktruck loading measurement in the extended part of the terminal. As well as existing part, also the new equipment was delivered in form of skid and approved according to MID.
FAT tests for Port Sudan | 2013
Metering skids for Port Sudan storage depot have been sucessfully tested. Skids with size upto 16" are designated for custody transfer of light fuels.
Additivation system for INA Rijeka and Solin, Croatia | 2012

Additivation systems for dispensing into tank trucks at the terminal in INA Rijeka and Solin. The first use of the new blending unit Accuplus - 15pcs.

AGROPODNIK DOMAZLICE, Czech Republic | 2012

Four old flowmeters were replaced by SMITH PRIME devices. 

Bahr Pump - TAMAS system and SKIDs for Eesti Energia, Estonia | 2012

Delivery of 6 SKIDs for rail terminal, switchboard for automated control system and instrumentation. Software:TAMAS system. There were needed major adjustments for dispensing into rail tankers. Product is a fuel extracted from shale.

Čepro, Loukov depot - new terminal, Czech Republic | 2012

Completely new terminal in Loukov. Building part - new bath, roofing bath, new substation. Technological part - new pumps, piping, low and high pressure valves. Electrical Engineering - new & reconnected drive units . Automation & instrumentation - a new PLC, field instrumentation.

Delivery of vapor recovery unit for ENI, Italy | 2012
Fabrication of 400 m3/h vapor recovery unit (cleaning of gasoline vapors) for marine loading terminal Livorno, EPC Jordan Technologies.
INKO, Loukov depot, unit PS 262, Czech Republic | 2012

Following the delivery of METROSTAV: full supply for low voltage switchgear for unit PS 262 - construction electrical part. Delivery of the 10-fields switchboard.

LUKOIL NEFTOCHIM BURGAS, Bulgaria | 2012

Railway terminal: Design, production and recovery of 11 measuring skids, TAMAS system for railway terminal (loading and unloading), mass measurement by Micromotions, Acculoads, integration to the LNHB system.

Measuring skids, KAR, Iraq | 2012

Delivery of 26 measuring skids with Micromotion for the refinery in Erbil / Kurdistan. Corioli prover with triple mass flow measurement, FloBoss control.

METROSTAV, Loukov depot, unit 237, Czech Republic | 2012

Construction of warehouse storage capacity, supply of instrumentation for a new unit No 237.

Modernisation of storage in Heřmanův Městec, Czech Republic | 2012

Extensive modernization of fuel storage at two locations - Vrbice I and Vrbice II, it affects about 20 objects; realisation: 2010-2012. Construction work and new automated control system for the new technology, a new system of measurement and control + camera security system.

Neste Oil MUUGA, Estonia | 2012

Design, production and recovery of 16 measuring skids and the system TAMAS for AC terminal. Skids based on volumetric measurement (PRIMA4) ACL. Colouring of the product by using devices EVA6. TAMAS system for unloading. 

ORDORIKO SE, Czech Republic | 2012

Reconstruction of storage: Installation of two tanks (250 m3), installation of metering skids, build of new loading and unloading islands.

Ostrava Airport, Czech Republic | 2012

Ostrava Airport - reconstruction of facilities. New wiring - cables, excavations - 22kV and 6kV for the airport area. Public lighting, gas connection. New (building + technology) high voltage substation HTS-2. New high voltage 22 and 6kV switchgear in three substations, new high voltage transformer, reconstruction of low voltage in substations.

Pardubice Airport, Czech Republic | 2012

Delivery of technology for storage, loading and unloading of products at the Airport of Pardubice, CZ. Delivery of automated control system and instrumentation - switchboard, field instrumentation and TAMAS system. Funded by the EU.

Prague Airport, Czech Republic | 2012

Prague Airport - measurement of density and pressure. Delivery of MicroMotions for measuring of density in the tank of fuel. Delivery of pressure gauges.

Skids for pipeline PETRONEEDS, Sudan | 2012

Design and fabrication of filtration, measuring and regulating skids based on mass measurements at the beginning and at the end of the pipeline from the company STAROIL. Our first application of crude oil. Development and production of stationary Corioli Prover. The first use of the crude oil analyzer and auto sampler.

Sliač Airport, the Ministry of Defence of the Slovak Republic, Slovakia | 2012

The contract for NATO: reconstruction of the airport in Sliač. The construction of new loading from rail tankers including 2 km long pipeline to the reservoirs (3x250m3) and output into tank trucks.

Delivery of equipment for Eesti Energia Narva truck loading facility, Estonia | 2011

Delivery of metering skids, grounding equipment and TAMAS control system for truck loading terminal for gasoline and shell oil products. At the moment, the project is extended by railway terminal.

Delivery of equipment for Neste Oil truck loading terminal in Tallinn-Muga, Estonia | 2011

Engineering, fabrication, installation supervision and start-up of metering skids and control system. The facility is owned by Neste Oil, a Finnish oil refining and marketing company.

Delivery of vapor recovery unit (cleaning of gasoline vapors) for MOL, Hungary | 2011

Fabrication of 300 m3/h vapor recovery unit for truck loading terminal Komárom, EPC Jordan Technologies.

Delivery of vapor recovery unit (cleaning of gasoline vapors) for Slovnaft, Slovakia | 2011

Fabrication of 300 m3/h vapor recovery unit for truck loading terminal Bratislava, EPC Jordan Technologies.

Filtering and metering system for Adbara depot, Sudan | 2011
Skids 12" class 900 and 16" class 600 for filtration, pressure control and flow metering of diesel and gasoline in redundand design. Including intargation into existing SCADA system.
Reconstruction of Lukoil Bourgas Railway Terminal, 2008 | 2011

Delivery of containerized coloring system, system for measuring of loaded and unloaded products, and TAMAS supervising system. 

Truck loading installation for Lukoil Ilientsi, Bulgaria | 2011

Delivery of complete truck loading installation with 4 loading islands, 16 metering systems for light fuels, top and bottom loading, additive dosing system for Lukoil and Shell additives, blending of biofuels and coloring of diesel fuels. Installation is completely automated by TAMAS control system.

Vapour recovery unit (VRU) for INSA Belozem loading terminal, Bulgaria | 2011

Delivery and integration of vapour recovery unit with 150 m3/h capacity.

中海油油气回收设备,中国 | 2011

深圳一湾油库400 m3/h油气回收设备的设计,制造,安装和调试

中石化油气回收设备,中国 | 2011

址山油库400 m3/h油气回收设备的设计,制造,安装和调试

Čepro, a.s. - Reconstruction of pipeline pumping station - Czech republic | 2010
Design, delivery installation of technology, electrical power supply and control system for pipeline pumping station Klobouky.
Čepro, a.s. - Reconstruction of tank gauging system, Czech republic | 2010
Integration of new tank gauging instruments into existing control system.
Custody transfer measurement system on Ceska Lipa tankfarm | 2010
Technology and control system for custody transfer measurement of unloading and loading and additive dosing of fuels on tax-free tankfarm. EPC contract.
Delivery of river tanker loading terminal for Slovenska plavba dunajska, Bratislava, Slovakia | 2010

EPC delivery of loading facility for liquid chemicals to river rankers through loading arms DN200. Laoding arms are hydraulically actuated and equipped by ERS (Emergency Rrelease System).

Delivery of vapor recovery unit (cleaning of gasoline vapors) for JSC Okseta, Lithuania | 2010
Fabrication of 150 m3/h vapor recovery unit for truck loading terminal Kaunas, EPC Jordan.
Delivery of vapor recovery units (cleaning of gasoline vapors) for public gas stations, Italy | 2010
2010-2011: Fabrication of 9 pcs  of mini compact vapor recovery unit installed on gas stations, EPC Jordan Technologies.
Dracar CZ - Custody transfer measurement system on Skrochovice tankfarm | 2010
Technology and control system for custody transfer measurement of unloading and loading and additive dosing of fuels on tax-free tankfarm.
Metering skids for Turkmenbashi complex of oil refineries, Turkmenistan | 2009
Design, fabrication and start-up assistance. Measuring and control of amount of products when loaded into ships. There are 14 metering skids for custody transfer of different oil products. The skids have been installed in the sea terminal in the Turkmenbashi complex for measuring and control of amount of products when loaded into ships.
NATO Roudnice - Tankfarm and terminal for diesel fuel, Czech Republic | 2009
Delivery, fabrication, assembly and commissioning of complex technology part of tankfarm and tanktruck terminal including auxiliary operations.
Prague airport - Rehabilitation of aviation fuel handling system - Czech Republic | 2009
Modernisation of technology for tank truck loading and installation of new automation system (EPC delivery).
Shell aviation fuel loading terminal in Helsinki, Finland | 2009
Delivery of 8 grounding testers for tank truck loading.
SK CARGO公司 – 在Čierna nad Tisou的接卸终端 - Slovakia | 2009

提供了完整的易燃品铁路接卸终端系统(EPC)。.

State reserves, pipeline Hermanuv Mestec, Czech republic | 2009
Construction of new pipeline 4 x DN200 which connects 2 separated parts of one tankfarm of petroleum products.
Agropodnik Domažlice - Fuel storage Domažlice - Czech republic | 2008

提供了生物油品的调合和添加剂自动加注系统。

Čepro, a.s. - 3 fuel storages refurbishing - Czech republic | 2008

重建CEPRO 3个的油库自动化管理系统。

FMC Technologies, Measurement Solutions, Hamburg - TanQuid fuel storage - Germany | 2008

为德国汉堡油库提供了油品接卸自动化管理系统和发油岛成套设备,以及 EVA5 添加剂自动加注系统。

OKZ Holding - Delivery of equipment for the fuel tanks - Slovakia | 2008

提供了油库的电子设备部分。

Paramo a.s. - Pardubice - Czech republic | 2008

生产H-LBUI, 罐车接卸的一部分。

SINOPEC - technologies delivery - China | 2008

为奥运会前夕的中石化油库新建和改建提供了油库的自动加注系统 EVA 6 和双泵组橇装。

State fuel reserves - Project documentation for State fuel reserves Bulgaria - Bulgaria | 2008

设计了保加利亚4个战略储备库。

上海浦东国际机场,自动加注系统,中国 | 2008

设计,施工,自动加注系统的交付。项目位于浦东国际机场,是世界机场之一。该油库配备了自动加注系统去提高航空油料的电导率。它是机场在油品卸载时用来加注添加剂到油品中。合同的交钥匙交付包括加剂单元和泵组撬装与现有装置的连接。


Additive dosing units - Poland | 2007
提供波兰油库的添加剂系统。
Army of Czech republic - Fuel storage Heřmanův Městec - Czech republic | 2007

完成部队油库的重建。

Čepro, a.s. - Biofuels - Czech republic | 2007

提供ČEPRO石油公司的生物油品混合技术和设备。

Čepro, a.s. - Fuel storage Roudnice nad Labem - Czech republic | 2007

重建Čepro油库接卸终端。

Cepro, a.s. - Terminal Roudnice nad Labem - Czech Republic | 2007
提供了Roudnice油库的TAMAS 和SCADA SCX 控制系统。
Chemoprojekt, a.s. - Roudnice storage - Czech republic | 2007

提供了Roudnice油库的自动化控制系统。

FAU Přerov - Fuel storage Přerov - Czech republic | 2007

提供生物油品技术和设备。

LUKOIL Bulgaria - Tank truck loading terminal Plovdiv - Bulgaria | 2007

鲁古伊油库EPC总承包项目。

Real HM Nové Zámky - Fuel storage Nové Zámky - Slovakia | 2007

A recuperation unit deployment.

SKANSKA, a.s. - Fuel storage - Potěhy, Roudnice a Šlapánov - Czech republic | 2007

完成SKANSKA油库重建工程。

Čepro a.s. - Sedlnice terminal - Czech republic | 2006

完成CEPRO 100 000m3 油库的交钥匙工程。3(EPC delivery)

Čepro, a.s. - Fuel storage Roudnice nad Labem - Czech republic | 2006

完成Roudnice油库自动化控制系统。

Cepro, a.s. - Terminal Sedlnice - Czech Republic | 2006
完成了Sedlnice油库的TAMAS和SCADA SCX 自动化控制系统。
Sinopec - Terminal Ningbo - China | 2006
设计并提供了中石化宁波三官堂油库一期的自动加剂系统、下装发油设施和加剂泵组。
Terminal BEGA - Latvia | 2006
完成BEGA乙二醇接卸工程。
Terminal Trebisov - Slovakia | 2006
完成油气回收和添加剂自动加注系统。
Mesaideed - QAPCO - Qatar Petrochemical Company - Qatar | 2005
提供接地测试仪给卡塔尔石油公司。
SIA | 2005
提供Olaine油库TAMAS 和SCADA SCX 油库一体化自动解决方案。
UAB | 2005
提供Kedainiai油库TAMAS 和SCADA SCX 油库一体化自动解决方案。
UAB | 2005
提供Vilnius油库TAMAS 和SCADA SCX 油库一体化自动解决方案。
Varna - Fuel warehouse - Bulgaria | 2005
完成Varna油库重建的概念性设计。
捷克 - Paramo, a.s. - Paramo Pardubice接卸终端 | 2005

设计安装完成付油系统,包括着色和添加的技术。 

波兰 - ORLEN/FMC Smith Meter - ORLEN, S.A, EVA 添加剂系统 | 2005
6个油库的添加剂系统。
斯洛伐克 - Progress Trading, s.r.o. - 油库和接付油系统 Trebisov | 2004

设计安装完成了复杂的接付油供应平台(铁路装载、公路装载和添加剂技术)。 

波兰 - ORLEN, S.A. - ORLEN, S.A, 接卸终端 | 2004

交付为了用于军事喷气机燃料而生产的添加剂设备EVA5。 

Lithuania - AVE MATROX UAB - 接发油系统, Kaunas | 2003

设计安装完成自控、技术和付油系统。 .

Lithuania - Mazeikiu Nafta - 接卸终端Butinge | 2003

设计安装完成两个新油罐区的测量和调节控制系统。

南斯拉夫 - KFOR - Kosovo 接卸终端 | 2003

设计安装完成Pristina 军队机场的付油系统。

捷克 - 捷克军队 - 油库 Hermanuv Mestec | 2003

设计安装完成轻燃油的添加剂单元。

波兰 - ORLEN, S.A. - 接卸终端 Mostiska - Warszawa | 2003

交付EVA5添加剂设备 

捷克 - ČEPRO a.s. - 接付油系统, Klobouky | 2002

重建了油库和付油系统。 

捷克 - ČEPRO a.s. - 接发油系统Mstetice | 2001

设计安装完成整个油库的重建工程。

波兰 - Petrochemia Blachownia - Blachownia 的接付油自控系统 | 2001

设计安装完成了铁路的接付油自控系统 。 

PTI Technologijos UAB - Terminal - Litva | 2000

完成PTI公司在LITVA的TAMAS® 和SCADA SCX 的油库一体化自动控制系统。

捷克 - ČEPRO a.s. - Cerekvice nad Bystrici的接付油系统 | 1999

设计安装完成测量、调节控制及接付油的自动化控制系统。 

捷克 - ČEPRO a.s. - Slapanov的接发油系统 | 1998

设计完成厂区、设备技术、测量、调节控制和接发油的自动化控制。

捷克 - ČEPRO a.s. - Smyslov接卸终端 | 1998

设计完成厂区、设备技术、测量、调节控制和接发油的自动化控制。

捷克 - PARAMO Pardubice a.s. - 铁路终端 | 1998

设计安装完成发轻燃油到铁路的槽车,在此过程中,并均匀的加入添加剂。

斯洛伐克 - OMV Slovakia a.s. - 油库Komarno | 1998

设计安装完成了复杂的多瑙河河上油库,包括技术和自控。这些油料通过驳船再用公路和铁路转到各个地方。 

捷克 - ČEPRO a.s. - Tremosna的接发油系统 | 1997

完成工程项目的设计、装配和油气回收的自动化控制系统,以及不同的油料产品终端。 

捷克 - Česká správa letišť a.s. / ESSO Czech a.s. - Praha – Ruzyně的机场油库 | 1997

完成工程项目的设计、装配、测量、调节控制及接卸的自动化控制。

捷克 - Shell 捷克 a.s. - 俄斯特拉发的轻燃油油库 | 1997

完成壳牌油库的项目工程设计、接卸技术和自动控制。 

斯洛伐克 - OMV Slovakia a.s. - Klacany 的油库 | 1997

完成项目的设计和油库的技术,及相应的自控系统。 

斯洛伐克 - VSŽ Doprava a.s. - Kosice 的接卸系统 | 1997

设计完成工程项目并提供了接付油的技术。 

捷克 - ABB Lummus Chemoprojekt Brno - Chemopetrol Litvinov 工程 | 1996

参与乙烯项目的仪表控制单元。 

捷克 - AGA GAS s.r.o. – 油气回收 | 1996

完成PARAMO Pardubice 的铁路接卸系统、电气设备和油气回收的自动化控制系统。

捷克 - ČEPRO a.s. - Hnevice 的接卸系统 | 1996

设计安装完成油气回收系统、相关技术和新的供应平台自控系统。

捷克 - ČEPRO a.s. - Strelice - Brno的接付油终端控制系统 | 1996

设计安装完成整个工程项目的装配、技术,重建了接卸系统(铁路接卸、油罐区、油气回收系统等)。

捷克 - Shell 捷克 a.s. - 布尔诺机场易挥发燃料库 | 1996

设计安装完成壳牌库区的控制系统,并完成了复杂的技术组合。 

斯洛伐克 - 斯洛伐克军队 - Zemianske Kostolany 的油库 | 1996

完成油库的项目工程设计、安装和重建。 

捷克 - Benol s.r.o. - Bzenec 的接发油自控系统 | 1995

设计安装完成装配、测量、调节控制及接卸的自动化控制系统。 

捷克 - ČEPRO a.s. - Cerekvice n. Bystrici的接卸终端 | 1995

安装完成装配、测量、调节控制及接卸的自动化控制。 

捷克 - Chemis s.r.o. - 斯洛伐克Brna的接发油自控系统 | 1995

设计安装完成整个工程项目的接卸系统(铁路接卸、油罐区、油气回收系统等)。 

India - Škodaexport a.s. - 产品生产线的监督 | 1994

设计安装完成SCADA系统,监测产品输送管网的运行,完成印度Kandle-Bhatinda项目,确保一切正常。

捷克 - KAME s.r.o - 在Prerov的油库 | 1994

完成整个工程项目和接卸系统(铁路接卸、油罐区、油气回收系统)。 

捷克 - 多方面的客户 - 组装完成加油站 | 1993

负责设计安装完成12个加油站的技术和接线。 

Loading