Przemysł
Czech Republic / 2014 - 2015
The supply and installation of two vertical storage tanks (capacity of each 50 m3), pipeline, valves, pump and steel structure.
The construction of three different types of aboveground storage tanks (capacity 1500 m3, 200 m3 and 140 m3) and manufacturing and supply tank 0.4 m3. All tanks completely made of stainless steel. Including complete insulation and sheathing.
Projekt, dostawa i odzysk sprzętu elektrycznego i automatyki, technologia elektrociepłownie Kielce.
(Projekt był realizowany przez Autel, a.s.)
Construction of a new warehouse ammonia. New building storage with three cylindrical tanks with a capacity of 95 m3 each, slop tank for unloading rail cisterns, bottom unloading arm, new pipelines, the new control room, ammonia leak detection, sprinkler system, new MaR and control system.
The construction of new reservoir for light fuel oil (capacity 1300m3), including unloading system, pipelines and new system of measurement and control.
Całkowity remont stacji chemicznego uzdatniania wody (system Wonderware).
Monitorowanie systemu energii elektrycznej dla OKD.
Monitorowanie zasobów węgla w celu wykrycia tlenku węgla.
Dostawa oprzyrządowania terminalu do napełniania aminy.
System sterowania systemu rur odprowadzania popiołu.
System sterowania i system dyspozytorni ciepłowni budowany w trzech etapach w powiązaniu z remontem poszczególnych kotłów włącznie z monitoringiem i oceną rozprowadzenia energii w zakładzie.
Projekt i dostawa urządzeń do pomiaru i regulacji ciśnienia w przystawkach baterii koksowniczych.
Monitoring, sterowanie produkcją ciepła i zużyciem energii elektrycznej ciepłowni.