Промишленост
Czech Republic / 2014 - 2015
The supply and installation of two vertical storage tanks (capacity of each 50 m3), pipeline, valves, pump and steel structure.
The construction of three different types of aboveground storage tanks (capacity 1500 m3, 200 m3 and 140 m3) and manufacturing and supply tank 0.4 m3. All tanks completely made of stainless steel. Including complete insulation and sheathing.
Design, delivery and recovery of electrical and automation control of technology at heating plant PGE Kielce.
(This project was implemented by subsidiary AUTEL, a.s.)
Construction of a new warehouse ammonia. New building storage with three cylindrical tanks with a capacity of 95 m3 each, slop tank for unloading rail cisterns, bottom unloading arm, new pipelines, the new control room, ammonia leak detection, sprinkler system, new MaR and control system.
The construction of new reservoir for light fuel oil (capacity 1300m3), including unloading system, pipelines and new system of measurement and control.
Пълна реконструкция на съоръжение за топлоенергия за химическа обработка на вода (Wonderware).
Мониторинг на съдържанието на СО в склад за въглища.
Доставка на технология за товарене на aмине.
Система за управление и диспечеризация на предприятие за производство на топлоенергия, изградено на три етапа, като реконструкция на отделни бойлери, включително наблюдение и оценка на разпределението на енергията вътре в предприятието.
Проектиране и доставка на MaR (измерване и регулация), както и управление на налягането в технологична линия за кокс.
Управляваща система за тръбопровод за пепел.
Наблюдение на производството на топлинна енергия и управление на потреблението на мощност в съоръжение за производство на топлина.